Project Description

PROJECT DESCRIPTION

The intervention was necessary following the landslides that occurred in the autumn of 2013 due to significant rainfall. The collapse has affected the landslide slope downstream of the Church of San Giusto, characterized by a considerable acclivity, going to affect the boundary wall of private property.

It was therefore necessary to provide the slope consolidation with punctual structural works, after the redefining of the slope itself, by means of suitable large steps. The slope was consolidated by means of a partition of micropiles and the reconstruction of the supporting wall on the border of the two properties.

BACK

Services provided: Design and Supervision of structural works, static testing, H&S Services during the design phase and during construction
Client: Diocesan Institute for the Support of the Clergy of Florence
Year: 2013 – 2015
Works amount: € 81.000,00
Location: Montalbino – Montespertoli – Florence – Italy

Projects category